top-contact

Customer Service Hotline : +607 - 288 1230 Support Payment

 

Internet Data CenterAIMS Data Center, Menara Aik Hua, Kuala Lumpur

Information

One (1) Primary and One (1) Redundant final Circuit from separate PDU. STS backup are provided at the primary source at the PDU level.

Specification
Location Menara Aik Hua, Changkat Raja Chulan, 50250 Kuala Lumpur, Malaysia
Site Specifications Ground Floor : 2,500 ft²
Mezzanine Floor : 2,500 ft²
Level 1 : 6,500 ft²
Level 2 : 6,500 ft²
Level 3 : 6,500 ft²
Level 4 : 6,500 ft²
Level 5 : 6,500 ft²
Building Information Single Block 18-storey commercial building and 3 basement parking

The building consists of 5-storey data centre floors and 3 sub-floor for the installation of Mechanical and Electrical facilities and power plants
Power Supplies 11kV HT Power Feed from TNB Power Grid
Power Capacity 5 MVA
Telecommunication Manhole Dual manhole for the incoming telecommunication fibre path

Diverse fibre trunking from Manhole sub-duct to the data centre floor
Antenna, Wireless or Microwave Equipment Space at Rooftop Yes

The UPS and EPG backup power are provided to the rooftop IDU Room.

Dedicated grounding system for the ODU body earth is installed at the rooftop. This earth point links to existing building basement earth chamber.

Multimode Fibre backbone links between rooftop IDU Room to the Data Centre.
Building Floor Information
Floor Height 3.8 meter, slab to slab
Floor Load 5 k-N per square meter
Total Data Centre Area 37,500 ft²
Office & Command Centre & Security Department Command Centre is located at Ground floor
Two levels of security control for the access to the data centre.

The first level of security access to the building is controlled by the building security department.

Second level of security access to the data centre is governed by AIMS internal security department.
Construction / Partitions
Ceiling No false ceilings for Data Center areas
Partitions 2 hours fire rated partition for each IG55 Fire zone.
Cabling System The data centre is installed with structured cabling system & infrastructure
Raised Floor System
RAF Height 600mm Raised Floor Height
RAF Type HPL Wood-core Rigid Grid System
Concentrated Load 4.5 kN
Uniform Load 12 k-N per Meter²
Underfloor Insulation Thermal Isolation Trocellin Polyethlene Foam
Perforated Panel Perforated Panels are placed at the Cold Aisle
DataCenter Specifications
Critical Load Power Density 100 watts per ft²
Cooling Density 120 watts per ft²
Cabinet Dimension 42RU 600mm (width) x 1000mm (depth)
Rack Arrangement Hot Aisle and Cold Aisle Configuration
Hot aisle spacing: 1,200mm
Cold aisle spacing: 1,000mm
Critical Load Power Distribution One (1) Primary and One (1) redundant final sub-circuits from Separate PDU within the data centre
Lighting 500lux light density at the Raised Floor
UPS System
UPS System 12-Pulse true-online Double Conversion Static UPS
UPS system is installed to protect data centre critical loads
UPS Capacity 400kVA per module
Total Capacity 2 x 1200kVA
UPS Battery Autonomy 10 minutes at full load
UPS Redundancy 2N Configuration
UPS External Bypass Provided
Synchronization Load Bus Synchronization is installed
Power Distribution Unit (PDU)
PDU Configuration Each PDU received one 415Vac protected Power Supply from UPS output panel within the data centre area.
PDU is equipped with Digital Power Meter, KWH Meter. The power meters provide the electrical consumption reading of the PDU through the KWH meter or digital meter via BMS interface
Isolation Transformer K-13 Rated Isolation Transformer is included in each PDU
PDU Capacity 200kVA
Circuit per Cabinet For 2N Configuration
Circuit Protection Each final circuit is individually protected by MCB and Isolation Transformer at PDU.
Circuit Breaker Sizes Single Phase 20A, 30A single Phase and three phase power supplies are available from the PDU.
AC Voltage at the cabinet level 240V/ 50 Hz
415V/50 Hz
-48V DC Plant 2N configuration. The DC Plant is supported by the EPG
DC Plant Capacity 2 x 3000A
Emergency Power Generator (EPG)
EPG Plant 2 x 2MVA Backup Diesel Generators
Fuel Tank External fuel tanks able to support EPG plant for 24 hours at Full load
Supported Services Data Centre CRACs, Chillers, Lighting and General Services within Data Centre Areas
Earthing System
“Dirty” Earth Both “Dirty” and “Clean” Earths will be available at the proposed data centre area.

The dirty (electrical) earth system is linked to existing building electrical earth.

All the electrical earth / bonding are connected to the Main Dirty Earth Bar including the raised floor system pedestals bonding.
“Clean” Earth “Clean” earth point is provided to each rack location under the raised floor.
ACMV System
Chiller System Air Cooled, chilled water based ACMV system Water is installed.
Chiller Redundancy N+1 redundancy for Chiller Unit
Chiller System Support Chiller System is supported by the EPG Plant
Chiller Pipe Dual chilled water piping system from Chiller Plant to the data centre floor and Ring chilled water circuit within the Data Centre floor.
CRAC System Down Flow Computer Room Precision Air Condition Units
CRAC Redundancy CRAC systems in the same farm area are configured in N + 1 and equipped with an automatic changeover controller.
CRAC Power Redundancy Each CRAC will connect to two power sources from difference ACMV panel via Automatic Transfer Switch (ATS)
CRAC System Support CRAC system will be supported by the EPG Plant
Supplement Cooling Overhead Supplement cooling is installed to support high density load. Refrigerant gas pipes is running from the supplement cooling distribution to the overhead supplement cooling
Temperature Control 22 Degree +/- 2º
Humidity Control 50 RH +/- 10 RH
Water Leakage Detection
Water Leakage Detection Water Leak Detection system is installed in data centre area.
Leak Detection type Resistive leak tape (cable) monitoring leakage at any point along the perimeter of the data centre area and surrounding the CRACs.
Fire Protection System
Fire Suppression Data Centre Areas are installed with Inert Gas IG-55 fire suppression system
IG-55 IG-55 Gas Suppression System will be installed above and under the raised access floor in data centre areas.
Fire Alarm and Detection System Two stages of alarms are implemented for IG-55 heat and smoke detection system.
HSSD System HSSD System is implemented above and under the raised floor operated independently from the Fire Alarm System
Security Access System
CCTV System Digital Surveillance System and Cameras are deployed at all of the AIMS data centre premises
Areas under surveillance cameras Corridors
Corridors leading to AIMS Data Centre.

Plant Areas
Switch Room, UPS Room, Backup Generator, Chiller Plant
Data Centre Area CCTV Cameras are installed at the entrance and corridors within the data centre areas. Every row of racks is monitored by the CCTV.
Control and Monitoring Videos are captured by the Digital Multiplexer located at data centre

Cameras are monitored at AIMS’s Security Control Room on 24 x 7
Recording / Backup Videos are captured in the Digital Multiplexer / Recorder’s hard disk and backed up to an external tape or DVD Media with 90 days storage period.
Building Management System (BMS)
System An integrated Building Management System (BMS) is installed to monitor and control all facilities within AIMS’ data centre.
Monitoring BMS system shall perform the following monitoring functions

- Automatic Control and Monitoring of the environmental control system.
- Monitoring of High Tension Supplies
- Monitoring of UPS and backup Generator Systems
- Monitoring of Switchboard, PDU, Fans, CRAC units
- Monitoring of Fire Safety System
- Monitoring of Water Detection
- Monitoring of Room Temperature and RH
Follow us on Facebook!
Follow Our Facebook Pagefor latest promotion deals!
iCore Technology Sdn. Bhd.
201201009133 (982653-K)

52B, Jalan Pendekar 18,
Taman Ungku Tun Aminah,
81300, Johor Bahru, Johor, Malaysia.

Phone
Mobile
WhatsApp
WeChat
E-mail
:
:
:
:
:
+607 - 288 1230
+6019 - 742 9566
+6019 - 742 9566
+6019 - 742 9566
[email protected]
Accepting Payment From
PayPal Visa MasterCard Maybank Public Bank iPay88 Malaysia E-Wallet Payment Alipay WeChat Payment

 

Sales & Service Tax

ST Reg No. : J31-1808-31031489

Chat with us on Telegram

Testimonials